Vessel Remediation Works – Unilever Minto
Stainless Steel Vessel Weld Exposure & Protective Coating Scope of WorksPerfect Remediation was engaged by Gordon Brothers Industries to deliver surface remediation services on a stainless steel vessel at Unilever’s Minto plant. The primary objective was to prepare the vessel for
Waterproofing – Sofitel Sydney Wentworth
Perfect Remediation and Refurbishment was recently engaged to carry out building element rectification and waterproofing repairs to the existing roof top of the Sofitel Sydney Wentworth, Philip Street Sydney. The building being built in circa 1966 has weathered over 57 years
Roof Remediation – Mt Annan
Perfect Remediation has successfully completed the roof remediation work, including structural steel & box gutter replacements to the existing 20 year old pool hall facility at Mt Annan Leisure Centre, Camden Council. As the principal contractor, Perfect Remediation was responsible for
Pedestrian Bridge Remediation – St. Leonards
Perfect Remediation was contracted to perform steel remediation of a pedestrian bridge at Herbert St in St. Leonards on behalf of our client, Forum Properties. The pedestrian bridge serves as a connection between St Leonards Train Station and Royal North Shore
Pool Culvert Remediation – Cumberland Council
Revered around the globe as one of the absolute best, an Australian summer is legendary. And even though the weather through this last one was less surface-of-the-sun and more Amazonian rainforest, the good people of Cumberland Shire at least had
Perfect Remediation and Refurbishment acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.