Surface prep is crucial. Without it, coatings fail, corrosion spreads, and asset life shortens.
Abrasive blasting and protective coatings aren’t just cosmetic – they’re critical to long-term performance and compliance.
Perfect Remediation offers abrasive blasting and industrial coating solutions for structural steel, concrete, tanks, bridges, and industrial assets.
Whether it’s site-based blasting or mobile preparation on remote structures, we apply the right system for the environment, asset, and lifecycle expectations.
We work cleanly, safely, and in full compliance with environmental and WHS controls.
What We Can Do For You
- Abrasive blast surface preparation (wet & dry blasting)
- Protective coating systems (epoxies, polyurethanes, zinc-rich primers)
- Coating removal & surface remediation
- Linings for chemical resistance & waterproofing
- Steel surface prep & coating reapplication
- Concrete sealing, resurfacing & protective treatments
- QA systems for surface profiles, DFTs, and cure verification
Perfect Remediation has the systems, trained applicators, and real-world knowledge to deliver coating outcomes that protect and perform.
Featured Projects
Manufacturing Facility in Minto
Client: Unilever
At the Unilever Manufacturing Facility in Minto, Perfect Remediation was engaged to prepare a stainless steel vessel for weld repairs and recoating. The scope included precise mechanical preparation of weld seams, followed by the application of a zinc-rich epoxy coating system.
Given the vessel’s complex geometry and confined work zone, our team used grinders, wire wheels, and flap discs to achieve the required surface profile without damaging adjacent equipment – all completed in a single mobilisation with zero disruption to surrounding operations.
Mount Annan Leisure Centre
Clients: YMCA / Camden Council
At the Mount Annan Leisure Centre, we undertook surface remediation to corroded steel elements including the slide structure, column bases, and connection points, all within a live public facility. Works were carried out using a combination of sandblasting and mechanical needling, with hoardings in place to isolate the work area. Given the proximity to public-use zones, dust containment, air monitoring, and safe staging were critical. Our team implemented effective controls and sequencing to complete the works cleanly and safely — without impacting centre operations.
Related Projects
Remediation of Four Short Span Bridges in Marrickville Project Locations: Victoria Road Bridge, Marrickville Le Clos Lane Bridge, Marrickville Silver Street Bridge, Marrickville Garners Avenue Bridge, Marrickville Scope of Works
Lobby Concrete Column & Slab Repairs Scope of Works Perfect Remediation was engaged to undertake targeted concrete repair works within the lobby of the Sofitel Sydney Wentworth as part of
Concrete Soffit Repairs & Carbon Fibre Strengthening Scope of Works Perfect Remediation was engaged to carry out structural concrete repairs and strengthening works at a private residential property in Kingsford.
Structural Strengthening and Concrete Repairs Scope of Works Perfect Remediation was contracted to carry out a complex remediation and structural strengthening project at a residential property in Palm Beach. The
General Concrete Remediation & Barrier Installation – Dangerous Goods Storage Area Scope of Works Perfect Remediation was engaged to deliver a range of remediation and protection works at the Albright
Perfect Remediation recently completed concrete remediation of the car park at SBS Studios Headquarters located in Artarmon. The busy 5-storey car park is used by the SBS employees and clients
