Remediation Works to Concrete Penetration – Sofitel Wentworth

Concrete-Penetration-Sofitel-Wentworth - 16

Project Details

Location

61-101 Phillip Street, Sydney, NSW

Client

Futuro Capital

Duration

Lobby Concrete Column & Slab Repairs

Scope of Works

Perfect Remediation was engaged to undertake targeted concrete repair works within the lobby of the Sofitel Sydney Wentworth as part of a wider refurbishment initiative. Our specific scope of delivery included:

  • Tap testing, site preparation, and concrete condition survey
  • Concrete column repairs, including removal of honeycombed or spalled surfaces and reinstatement using high-strength repair mortars
  • Concrete slab repairs at multiple locations, including slab penetrations and surface degradation
  • Preparation and patching of slab penetrations, in coordination with engineers and surveyors
  • All materials, labour, and supervision for formwork, surface cleaning, patching, and levelling
  • Use of access scaffold and containment equipment to reach elevated areas safely.

Challenges

  • The scope was embedded within a live commercial hotel refurbishment, requiring discrete operations and effective coordination with other trades
  • Some slab penetrations had restricted underside access, necessitating scaffold setup and strategic propping
  • Variability in existing concrete conditions required real-time adjustments to quantities and application areas
  • Client expectations for clean, flush finishes were particularly high given the five-star hospitality environment.

How PRR Overcame the Challenges

Perfect Remediation adapted to the dynamic site conditions with control and professionalism:

  • Performed detailed preparation and patching on over 716 litres of concrete across floor and soffit zones
  • Completed the column repair scope with a total of 172.2 litres applied across designated locations
  • Collaborated with the project manager and site engineers to adhere to warranty conditions, as required for structural compliance
  • Installed temporary scaffold and formwork safely and efficiently, enabling fast and tidy repairs above sensitive areas like the Flynn Bar and gym
  • Delivered the project in alignment with staged scheduling, avoiding disruption to the hotel’s public-facing operations.

GET A FREE QUOTE TODAY!

PERFECT REMEDIATION is capable of carrying out project like

Remediation Works to Concrete Penetration – Sofitel Wentworth

with a quick turn around, give us a call today on (02) 7912 3054Whether you’re undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

Request a Callback!

Let us assist you to find the remediation services you need. Please contact us using the information below or fill out the form below.

(02) 7912 3054 info@perfectremediation.com.au

OR

Let us call you back!

We’ll call you back as soon as possible, usually within 1 hour.

    aboriginal flagsPerfect Remediation and Refurbishment acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.