Company

SYDNEY Head Office
4/8 Lilian Fowler Place
Marrickville NSW 2204
(02) 7912 3054
1300 737 332

QUEENSLAND Office
23 Aranda Steet
Slacks Creek QLD 4127
(07) 2145 6581

Mon-Fri: 7am-5pm
Sat-Sun: Closed

enquiries@perfectremediation.com.au

Blue Cattle Dog – Asphalt Works

Blue Cattle Dog – Asphalt Works | Perfect Remediation | Perfect Remediation & Refurbishment

Project Details

Location

St Clair NSW

Client

ALH Holding Pty Ltd

Duration

1 month

Carpark Asphalt Reinstatement & Ditch Filling

Scope of Works

Perfect Remediation was engaged to undertake asphalt resurfacing and carpark improvement works at the Blue Cattle Dog Hotel in St Clair. The works were carried out in five planned stages to allow the facility to remain operational throughout the project duration.

The scope included:

  • Demolition and milling of existing asphalt surfaces
  • Sweeping, cleaning, and tack coating of the milled surface prior to laying new asphalt
  • Asphalt reinstatement using AC10 wearing course in both 50mm and 100mm thicknesses across designated areas
  • Filling of an existing open ditch with asphalt in the covered carpark zone to create a seamless, level surface
  • Realignment of existing bollards impacted by vehicle traffic
  • Line marking reinstatement to match the original layout of parking bays and traffic control areas
  • Staged works delivery, including staging of access/egress routes and temporary compound setup.

Challenges

  • The project required live site staging and coordination with hotel management to ensure carpark access was maintained for patrons throughout the works
  • Weather-sensitive scheduling was critical due to the nature of asphalt laying and curing times
  • The ditch infill area had variable substrate conditions, requiring careful compaction to ensure long-term durability
  • Bollards had been previously misaligned due to traffic wear and required non-standard resetting and straightening.
Before

How PRR Overcame the Challenges

Perfect Remediation delivered the project efficiently and with minimal disruption through careful planning and communication:

  • Implemented a 5-stage program, as detailed in the approved staging plan, to ensure site access and safety were preserved at all times
  • Coordinated closely with hotel operations to ensure key access routes and accommodation parking remained functional during works
  • Used road saws, compactors, and quality asphalt laydown techniques to ensure each reinstated zone met traffic durability expectations
  • Completed full clean-up, line marking, and bollard realignment to restore functionality and presentation of the carpark
  • Delivered the works on time and within budget.
Carpark Asphalt Reinstatement & Ditch Filling 7 | Blue Cattle Dog – Asphalt Works | Perfect Remediation | Perfect Remediation & Refurbishment
After

GET A FREE QUOTE TODAY!

PERFECT REMEDIATION is capable of carrying out project like

Blue Cattle Dog – Asphalt Works

with a quick turn around, give us a call today on (02) 7912 3054Whether you’re undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

Request a Callback!

Let us assist you to find the remediation services you need. Please contact us using the information below or fill out the form below.

(02) 7912 3054 info@perfectremediation.com.au

OR

Let us call you back!

We’ll call you back as soon as possible, usually within 1 hour.

    aboriginal flagsPerfect Remediation and Refurbishment acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.