General Concrete Remediation – Albright & Wilson

General Concrete Remediation-5

Project Details

Location

Wetherill Park NSW

Client

Albright & Wilson (Australia) Limited

Duration

General Concrete Remediation & Barrier Installation - Dangerous Goods Storage Area

Scope of Works

Perfect Remediation was engaged to deliver a range of remediation and protection works at the Albright & Wilson chemical manufacturing facility in Wetherill Park.

The project consisted of multiple concrete repairs and structural adjustments within the site’s Dangerous Goods Storage Zone, which included both slab replacement and protective barrier installation.

Works included:

  • Removal and replacement of a deteriorated concrete slab (approx. 5.2m x 1.8m) in front of the Dangerous Goods Storage Area.
  • Saw-cutting and breakout of the existing slab, followed by removal and disposal.
  • Concrete scanning prior to cutting to locate buried services.
  • Installation of new steel dowels and reinforcement mesh, followed by new concrete pour with broom or coved finish.
  • Final cleaning and reinstatement of the working area.

Additional scope across the facility included:

  • Stabilisation of dislodged concrete walls, damaged by pallet impact from forklifts.
  • Installation of galvanised L-shaped angle restraints anchored between the floor slab and bunting wall.
  • Installation of rubber or plastic pallet bumper stops to prevent further wall damage.
  • Localised concrete patching at drumming station areas to eliminate trip hazards.

Challenges

As with any work inside a live industrial chemical facility, the project presented multiple operational and procedural challenges:

  • Strict safety compliance was required, including Albright & Wilson’s full site induction, work permit system, and adherence to hazardous materials protocols.
  • Mandatory PPE, speed restrictions, and high-visibility work zones had to be enforced and maintained.
  • The team had to coordinate all tasks around ongoing plant operations, ensuring zero disruption to critical infrastructure.
  • Tight working areas, combined with high pedestrian and forklift traffic, required constant vigilance and well-managed access control.
Before

How PRR Overcame the Challenges

Perfect Remediation met these challenges through meticulous planning and execution:

  • Completed all Albright & Wilson inductions and permit procedures, ensuring all staff were site-compliant from day one.
  • Conducted surface scanning prior to cutting to avoid service clashes and hazards.
  • Worked closely with the client’s on-site safety team to schedule activities during safe operational windows.
  • Installed barriers and restraints to reduce future asset damage caused by forklifts and pallet movement.
  • Delivered the concrete slab replacement and protection systems on time and with zero safety incidents.

 

After

GET A FREE QUOTE TODAY!

PERFECT REMEDIATION is capable of carrying out project like

General Concrete Remediation – Albright & Wilson

with a quick turn around, give us a call today on (02) 7912 3054Whether you’re undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

Request a Callback!

Let us assist you to find the remediation services you need. Please contact us using the information below or fill out the form below.

(02) 7912 3054 info@perfectremediation.com.au

OR

Let us call you back!

We’ll call you back as soon as possible, usually within 1 hour.

    aboriginal flagsPerfect Remediation and Refurbishment acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.