Ausgrid Pit Transformer Replacement Works – Sofitel Wentworth
Ausgrid Substation Transformer Replacement Access Works Scope of WorksPerfect Remediation was engaged to provide physical site access to a long-concealed Ausgrid substation hatch beneath the public laneway adjoining the Sofitel Sydney Wentworth. The purpose was to enable Ausgrid’s scheduled replacement of
Roof Remediation – Mt Annan
Perfect Remediation has successfully completed the roof remediation work, including structural steel & box gutter replacements to the existing 20 year old pool hall facility at Mt Annan Leisure Centre, Camden Council. As the principal contractor, Perfect Remediation was responsible for
Pedestrian Bridge Remediation – St. Leonards
Perfect Remediation was contracted to perform steel remediation of a pedestrian bridge at Herbert St in St. Leonards on behalf of our client, Forum Properties. The pedestrian bridge serves as a connection between St Leonards Train Station and Royal North Shore
Chemical Plant Remediation in Wetherill Park
Albright & Wilson is a leading manufacturer of phosphates and surfactants in the household, mining & agriculture, industrial and food & beverage industries. They have been servicing the Australian chemical industry with phosphates since 1939 and surfactants since 1958, and
Pool Culvert Remediation – Cumberland Council
Revered around the globe as one of the absolute best, an Australian summer is legendary. And even though the weather through this last one was less surface-of-the-sun and more Amazonian rainforest, the good people of Cumberland Shire at least had
Perfect Remediation and Refurbishment acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.