Remediation Works to Concrete Penetration – Sofitel Wentworth
Lobby Concrete Column & Slab Repairs Scope of WorksPerfect Remediation was engaged to undertake targeted concrete repair works within the lobby of the Sofitel Sydney Wentworth as part of a wider refurbishment initiative. Our specific scope of delivery included:Tap testing, site
Ausgrid Pit Transformer Replacement Works – Sofitel Wentworth
Ausgrid Substation Transformer Replacement Access Works Scope of WorksPerfect Remediation was engaged to provide physical site access to a long-concealed Ausgrid substation hatch beneath the public laneway adjoining the Sofitel Sydney Wentworth. The purpose was to enable Ausgrid’s scheduled replacement of
Gym Refurbishment Works – YMCA Camden
YMCA Gym Refurbishment Works - Reception Joinery & Gym Wall Removal Scope of WorksFollowing successful remediation works for Camden Council at the broader Mount Annan Leisure Centre site, Perfect Remediation was engaged directly by tenant YMCA to carry out targeted interior
Stormwater Remediation – Penrith Post Office
Penrith Australia Post Office Stormwater Upgrade Scope of WorksPerfect Remediation was engaged by Proactive Contracting to deliver a comprehensive stormwater infrastructure upgrade at the Penrith Australia Post Office site. The scope included:Supply and installation of two new 150mm stainless steel downpipes,
Louvre Façade Refurbishment – Double Bay Post Office
Remediation Works to Double Bay Post Office Scope of WorksPerfect Remediation was engaged to supply and install a new aluminium façade louvre system for the Australia Post office in Double Bay. This required a complete replacement of the existing façade louvres,
Façade Remediation – Campbelltown Post Office
Remediation Works to Campbelltown Post Office Scope of WorksPerfect Remediation was engaged to carry out a comprehensive façade and roof remediation project at Australia Post Campbelltown. The scope included:Erection of scaffolding along the footpath, including securing council approvals for public access
Tenancy Make Good – City of Sydney
HAZMAT Remediation & Make Good Works - George Street Tenancy Scope of WorksPerfect Remediation was engaged by Ventia to carry out end-of-lease make good works at a tenancy located in the heart of the Sydney CBD. The works involved the safe
Oil Spill Remediation – Kraft Heinz
Oil Spill Soil Remediation & Waste Disposal Scope of WorksPerfect Remediation was contracted by Kraft Heinz to perform urgent remediation works following an oil spill incident at their Seven Hills site. The affected area spanned approximately 10m x 20m, with an
Blue Cattle Dog – Asphalt Works
Carpark Asphalt Reinstatement & Ditch Filling Scope of WorksPerfect Remediation was engaged to undertake asphalt resurfacing and carpark improvement works at the Blue Cattle Dog Hotel in St Clair. The works were carried out in five planned stages to allow the
Concrete Slab Extension – Albright & Wilson
External Concrete Slab Extension - Storage Yard Scope of Works Perfect Remediation was engaged by Albright & Wilson to construct a new external concrete storage slab as part of the facility’s yard expansion. The slab was designed to match existing ground levels